|
Ventilation raise
|
At the end of the sixties, important modernization works where made in this old french metalliferous mine. The deepening of the most distants parts from the entry caused an increased ventilation need. This one was solved by the digging with the Robbins reamer of a new 120 m depth vertical shaft.
|
|